7th
February 2022
Table coming together
This the parts for the table having their edges varnished. Tracey was able to choose whatever colour and texture she wanted in Abet Laminate. This was then bonded to marine ply of the required thickness. Tracey decided to go for exposed edging and it looks great.
6th
February 2022
SKETCH
She's a jaunty little thing!
4th
February 2022
Ballast
A couple of tons of lead being melted down for ingots. We bought an old keel from a local yard as well as some internal ballast from an old work boat. The joy of internal ballast is that you can move it fore and aft to get the right trim.
4th
February 2022
Ballast
Lead for the ballast
4th
February 2022
Mast
Mast tubes are collected and ready for construction
1 |
2 |
3 |
4 |
5 |
6 |
7 |
8 |
9 |
10 |
11 |
12 |
13 | 14 |
15 |
16 |
17 |
18 |